无码区a∨视频体验区30秒-亚洲视频在线观看-国产在线视频一区二区三区-亚洲午夜精品一区二区

Shenzhen great tower Industrial Co., Ltd.

Analysis of installation process of pneumatic diaphragm pump

Views: Update time:2021-01-19

Analysis of installation process of pneumatic diaphragm pump

1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

Analysis of installation process of pneumatic diaphragm pump(圖1)

Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

主站蜘蛛池模板: 野狼第一精品社区| 国产aⅴ无码专区亚洲av| 特级欧美aaaaaaa免费观看| 都市激情 在线 亚洲 国产| 午夜成人无码福利免费视频| 免费无遮挡无码永久视频| 少妇被躁爽到高潮无码人狍大战| 脱了我奶罩亲我奶头好舒服| 99久久99久久精品国产片果冻| 国产在线精品一区二区不卡| 国产精品成人无码视频| 久久精品国产精品亚洲| 国产成人精品日本亚洲11| 特黄aaaaaaaaa毛片免费视频| 午夜无码a级毛片免费视频| 男女上下猛烈啪啪免费看| 黄网站欧美内射| 99无码熟妇丰满人妻啪啪| 97夜夜澡人人爽人人喊中国片| av天堂午夜精品一区| 米奇777四色精品人人爽| 亚洲高清毛片一区二区| 久久婷婷五月综合97色一本一本| 中文字幕久久久人妻无码 | 久久婷婷五月国产色综合| 国产欧美综合一区二区三区| 国产熟女乱子视频正在播放| 蜜臀av无码一区二区三区| 亚洲av无码一区二区三区在线播放 | 欧美喷潮久久久xxxxx| 影音先锋每日av色资源站| 亚洲性无码av中文字幕| 精品国产粉嫩内射白浆内射双马尾| 成年大片免费视频| 欧美性猛交xxx嘿人猛交| 无遮挡边吃摸边吃奶边做| 国人国产免费av影院| 亚洲av网址在线观看| 久久久精品一区aaa片| 精品无码国产av一区二区三区| 国产成人免费ā片在线观看|